I thought you guys would like to see how the front door / front walkway project is coming along. It's got a long way to go yet, but it's getting there slowly.
Here's the final result on the Victorian door knocker, after three cleanings with stripping agent to get the paint off. I decided to use an old bronze Chinese coin as the strike plate for the knocker. Gotta stick with the historic theme, ya know?
Here's the basic layout of the cobblestones (these are the ones that are the old cobblestones from San Francisco) and the door is taped off ready for sanding, priming and deep red paint.
Today I started digging out the trench needed for the cobblestones. I had to go down about eight inches, through lots of rocks n' roots. And the only artifact I've found so far was a pull tab darn it!! Once the trench is done, it will be lined with sand, the cobblestones set it even with the ground level and aligned, then gravel filled in between.